Commit Graph

5 Commits

Author SHA1 Message Date
Tudor Sitaru
d591d8e66b fix(utils): handle null year in formatAcademicYear
All checks were successful
Build and Push Docker Images / Build Backend (FastAPI) (push) Successful in 12s
Build and Push Docker Images / Build Frontend (Next.js) (push) Successful in 48s
Build and Push Docker Images / Build Pipeline (Meltano + dbt + Airflow) (push) Successful in 12s
Build and Push Docker Images / Trigger Portainer Update (push) Successful in 0s
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-04-01 16:07:28 +01:00
Tudor Sitaru
4db36b9099 feat(ui): add phase indicators to school list rows
All checks were successful
Build and Push Docker Images / Build Backend (FastAPI) (push) Successful in 12s
Build and Push Docker Images / Build Frontend (Next.js) (push) Successful in 49s
Build and Push Docker Images / Build Pipeline (Meltano + dbt + Airflow) (push) Successful in 11s
Build and Push Docker Images / Trigger Portainer Update (push) Successful in 1s
Add coloured left-border and phase label pill to visually differentiate
school phases (Primary, Secondary, All-through, Post-16, Nursery) in
search result lists. Colours are accessible (WCAG AA) and don't clash
with existing Ofsted/trend semantic colours.

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-04-01 15:47:51 +01:00
784febc162 feat(seo): add school name to URLs, fix sticky nav, collapse compare widget
Some checks failed
Build and Push Docker Images / Build Backend (FastAPI) (push) Successful in 32s
Build and Push Docker Images / Build Frontend (Next.js) (push) Failing after 57s
Build and Push Docker Images / Build Pipeline (Meltano + dbt + Airflow) (push) Successful in 31s
Build and Push Docker Images / Trigger Portainer Update (push) Has been skipped
- URLs now /school/138267-school-name instead of /school/138267
- Bare URN URLs redirect to canonical slug (backward compat)
- Remove overflow-x:hidden that broke sticky tab nav on secondary pages
- ComparisonToast starts collapsed — user must click to open

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-03-29 12:41:28 +01:00
cd1c649d0f fix(frontend): format 6-digit EES academic year codes correctly
All checks were successful
Build and Push Docker Images / Build Backend (FastAPI) (push) Successful in 32s
Build and Push Docker Images / Build Frontend (Next.js) (push) Successful in 1m5s
Build and Push Docker Images / Build Pipeline (Meltano + dbt + Airflow) (push) Successful in 31s
Build and Push Docker Images / Trigger Portainer Update (push) Successful in 1s
formatAcademicYear now handles both 4-digit (2023→2023/24) and 6-digit
EES codes (202526→2025/26). Applied to all year displays: SATs, phonics,
admissions, finances, and the yearly results table.

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-03-27 18:30:37 +00:00
Tudor
ff7f5487e6 Complete Next.js migration with SSR and Docker deployment
Some checks failed
Build and Push Docker Images / Build Backend (FastAPI) (push) Successful in 1m26s
Build and Push Docker Images / Build Frontend (Next.js) (push) Failing after 1m48s
Build and Push Docker Images / Trigger Portainer Update (push) Has been skipped
- Migrate from vanilla JavaScript SPA to Next.js 16 with App Router
- Add server-side rendering for all pages (Home, Compare, Rankings)
- Create individual school pages with dynamic routing (/school/[urn])
- Implement Chart.js and Leaflet map integrations
- Add comprehensive SEO with sitemap, robots.txt, and JSON-LD
- Set up Docker multi-service architecture (PostgreSQL, FastAPI, Next.js)
- Update CI/CD pipeline to build both backend and frontend images
- Fix Dockerfile to include devDependencies for TypeScript compilation
- Add Jest testing configuration
- Implement performance optimizations (code splitting, caching)

Co-Authored-By: Claude Sonnet 4.5 <noreply@anthropic.com>
2026-02-02 20:34:35 +00:00