Commit Graph
2 Commits
Author SHA1 Message Date
TudorandClaude Fable 5 4a52735356 feat(sdlc): staging environment + automated staging→prod pipeline
PR Checks / Frontend Typecheck + Tests (pull_request) Successful in 10m0s
PR Checks / Backend Smoke (pull_request) Successful in 48s
PR Checks / Build Backend (no push) (pull_request) Successful in 17s
PR Checks / Build Frontend (no push) (pull_request) Successful in 41s
PR Checks / Build Pipeline (no push) (pull_request) Successful in 10s
PR Checks / AI Code Review (Claude) (pull_request) Successful in 24s
- pr-checks.yml: PR gate — frontend typecheck+jest, backend import smoke,
  image builds (no push), Claude AI review posted as PR comment (severe
  findings block merge)
- deploy.yml (replaces build-and-push.yml): merge to main builds+pushes
  images tagged sha-<sha>/staging, deploys the staging Portainer stack via
  webhook, runs Playwright E2E journeys against staging, then retags the
  verified images :prod (previous kept as :prod-previous) and deploys prod
- docker-compose.portainer.staging.yml: second Portainer stack — :staging
  images, sc_staging_* names, own macvlan IPs, Airflow on 8081; data
  bootstrapped from source via the staging Airflow DAGs
- prod compose now pins :prod instead of :latest (only the promotion step
  moves it; :latest is no longer published)
- e2e/: 6 Playwright journeys (search, postcode, detail, compare, rankings)
  driven by BASE_URL — the promotion gate
- scripts/ci/ai_review.py: Claude review with structured JSON findings
- docs/DEPLOY.md: full SDLC doc incl. one-time setup checklist and rollback
- replaced removed 'next lint' with tsc typecheck; fixed stale jest tests
  (slug URLs, N/A formatting, stable trend, fake-timer setup)

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01PqGhF93UrpDNvXBLMjJENL
2026-07-03 06:50:40 +01:00
TudorandClaude Sonnet 4.5 ff7f5487e6 Complete Next.js migration with SSR and Docker deployment
Build and Push Docker Images / Build Backend (FastAPI) (push) Successful in 1m26s
Build and Push Docker Images / Build Frontend (Next.js) (push) Failing after 1m48s
Build and Push Docker Images / Trigger Portainer Update (push) Has been skipped
- Migrate from vanilla JavaScript SPA to Next.js 16 with App Router
- Add server-side rendering for all pages (Home, Compare, Rankings)
- Create individual school pages with dynamic routing (/school/[urn])
- Implement Chart.js and Leaflet map integrations
- Add comprehensive SEO with sitemap, robots.txt, and JSON-LD
- Set up Docker multi-service architecture (PostgreSQL, FastAPI, Next.js)
- Update CI/CD pipeline to build both backend and frontend images
- Fix Dockerfile to include devDependencies for TypeScript compilation
- Add Jest testing configuration
- Implement performance optimizations (code splitting, caching)

Co-Authored-By: Claude Sonnet 4.5 <noreply@anthropic.com>
2026-02-02 20:34:35 +00:00