docs: two-stage deploy model (staging auto, production manual)
PR Checks / Frontend Typecheck + Tests (pull_request) Successful in 9m36s
PR Checks / Backend Smoke (pull_request) Successful in 7s
PR Checks / Build Backend (no push) (pull_request) Successful in 10s
PR Checks / Build Frontend (no push) (pull_request) Successful in 43s
PR Checks / Build Pipeline (no push) (pull_request) Successful in 10s
PR Checks / AI Code Review (Claude) (pull_request) Failing after 2m10s

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_0146VHeLAWjDVE2B5uU67jCB
This commit is contained in:
Tudor
2026-07-13 08:38:37 +01:00
co-authored by Claude Fable 5
parent 75e92dc7f5
commit 2b563cc0bf
2 changed files with 44 additions and 19 deletions
+8 -4
View File
@@ -112,11 +112,15 @@ Full details in `docs/DEPLOY.md`. The short version:
- **Never push to `main` directly.** Work on a feature branch and open a PR;
branch protection requires the PR checks (typecheck, tests, builds, AI review)
to pass before merge.
- Merging to `main` deploys automatically: images are built once, deployed to
the **staging** Portainer stack, verified by the Playwright journeys in
`e2e/`, and only then retagged `:prod` and rolled out to production.
- Merging to `main` deploys automatically **to staging only**: images are
built once, deployed to the staging Portainer stack, and verified by the
Playwright journeys in `e2e/`. Production is a second, manual approval:
the "Promote to Production (manual)" workflow in Gitea Actions, run after
testing the feature on staging. It refuses commits whose staging E2E gate
isn't green. Never trigger it yourself — promotion is the human's call.
- If you change user-facing behaviour, update or extend the `e2e/` journey
tests in the same PR — they are the promotion gate.
tests in the same PR — they gate whether staging is fit for human testing
and whether a commit is promotable.
## Recent Changes